>>Japanese

[ Information ]

Normal mission operation of TRMM PR completed on 7 October 2014 (UTC).
--------------------------------------------------
TRMM PR experienced a data loss
from 29 May 2009 at UTC 04:39 to 17 June 2009 at UTC 01:53.


Date and time in UTC (Daily/Hourly) Sensor/Time Parameters
- -
TMI Surface Rain [2015-Apr-08]





 PR estimated surface rain rate
 PR rain rate(2,4,6,8,10km)
 PR height of storm
 PR rain type flag

 TMI surface rain
 TMI total cloud liquid water
 TMI total precipitation ice
 TMI brightness temperature of 85GHz-V
 TMI brightness temperature of 85GHz-H

 Difference between TMI and PR rain rate (TMI-PR)

 VIRS IR channel (cloud)



 VIRS Sea Surface Temperature
 TMI Sea Surface Temperature
 

Copyright @2007 Japan Aerospace Exploration Agency, Earth Observation Research Center
All rights reserved.